Risk intelligence
BCDR Risk Assessment Executive Dashboard
A single view of business continuity and disaster recovery maturity: how likely each hazard is, how severe the impact would be, and how much risk remains after controls and recovery capability are taken into account.
Threat register
| Threat | Likelihood | Impact | Inherent risk | Control effectiveness | Recovery capability | Residual risk | Priority |
|---|---|---|---|---|---|---|---|
| Earthquake | 3 | 5 | 60 | 25% | 25% | 46.5 | P2 |
| Flood | 3 | 5 | 60 | 25% | 25% | 46.5 | P2 |
| Hurricane | 3 | 5 | 60 | 25% | 25% | 46.5 | P2 |
| Tornado | 2 | 5 | 40 | 25% | 25% | 31.0 | P3 |
| Thunderstorm & Lightning | 4 | 3 | 48 | 25% | 25% | 37.2 | P3 |
| Wildfire | 3 | 5 | 60 | 25% | 25% | 46.5 | P2 |
| Extreme Heat | 4 | 4 | 64 | 25% | 25% | 49.6 | P2 |
Residual risk by threat
Likelihood × impact heat map
- 0–19 Low
- 20–39 Moderate
- 40–59 High
- 60–79 Critical
- 80–100 Severe
Control domains
| Control domain | Weighted gap | Effectiveness | Status |
|---|---|---|---|
| Life Safety | — | — | Pending |
| Facility Protection | — | — | Pending |
| Power & Cooling | — | — | Pending |
| Network/Communications | — | — | Pending |
| Data Protection | — | — | Pending |
| Application/DR | — | — | Pending |
| Incident Response | — | — | Pending |
| Testing/Governance | — | — | Pending |
Domain scores calculate once the assessment questionnaire is completed.
Methodology
Inherent risk = likelihood × impact × 4. Likelihood and impact are editable client or site inputs.
Question answers convert to a deficiency score of 0–4 and are weighted 1–5. “Unknown” is deliberately penalized.
Residual risk uses the control gap, recovery capability and a common-mode multiplier. Override floors can supersede averages.
Use override rules for catastrophic combinations: enter the applicable floor in the Threat Scoring sheet (column K) and the multiplier in column I.
Know where you stand?
Use the free template to turn these findings into a business continuity plan.

